Practical r.c.c colume
Aim:- To Prepare R.C.C Column.
Requirement:-Tools and equipment measuring tape, thapi, khore, gunny bags,etc
Materials:-8mm torshan bar, 6 mm bar, sand, gravels, cement, water, etc
Procedure:- 1) Take torshan bar 8 mm and 6 mm bar make frame and ring
2) Mix cement, gravels, sand, prepare concrete
3)Take molde and fix torshan bar and fill with concrete
4) use G.I wire to roped it a molde
Sr.no
|
MATERIALS
|
QTY
|
RATE
|
AMOUNT
|
1
|
SAND
|
4 TOPLI
|
15 PER
|
60
|
2
|
GRAVELS
|
2 TOPLI
|
12 PER
|
24
|
3
|
CEMENT
|
2 TOPLI
|
8 PER
|
112
|
4
|
TORSHAN BAR 8 MM
|
1.931kg
|
48 KG
|
92.68
|
5
|
TORSHAN BAR 6 MM
|
0.222kg
|
48 KG
|
92.68
|
WORKING CHARGE 25%
|
95.34
| |||
TOTAL
|
476.70
|